The city of Sandy Springs will pave about six miles and reconstruct almost two miles of roads this budget year. Since the city incorporated in 2005, more than 80 miles of roads have been paved or reconstructed.

Roads to be paved this year are:

  • Powers Ferry Road from Mount Vernon Highway to Mount Paran Road
  • Jett Road from Mount Paran Road to Crest Valley Drive
  • Cliftwood Drive from Roswell Road to Lake Forest Drive
  • Northside Drive from Heards Ferry Road to Powers Ferry Road
  • Interstate North Parkway from Northside Drive to the city limits
  • Marchand Court from Barnard Place to the end
  • Greenpine Drive from Northland Drive to the end
  • Meridian Mark Road from Glenridge Connector to Johnson Ferry Road
  • River Springs Court from River Springs Drive to the end
  • Brackenwood Circle from Glenridge Drive to the end
  • Sagebrush Drive from Spalding Drive to Bittersweet Trail

Roads to be reconstructed this year are:

  • Misty Ridge Manor from Mount Paran Road to the cul-de sac
  • Green Oak Court from Burdett Road to the end
  • Mystic Place from Mystic Drive to Roswell Road
  • Cherrywood Lane from Windsor Parkway to Franklin Road
  • Forestgate Court from Towergate Place to the end
  • South Spalding Lake Drive from Spalding Drive to the end
  • Brandonshire Road from Dunwoody Club Drive to Happy Hollow Road
  • Keymar Court from South Spalding Lake Drive to the end
  • High Point Lane from High Point Road to the end